Cabell Huntington Hospital boiler system complete

Boiler #3 set in place.

Boiler #3 set in place.

Geiger Brothers has completed installation of a new boiler and support systems at West Virginia’s Cabell Huntington Hospital.  The project began in September 2013.

The scope of work included installation of one of the required high pressure steam boilers serving the main hospital, along with steam piping from the sub-basement to the 6th floor mechanical penthouse.

The project included heating and cooling exchange system upgrades to increase the hospital’s capacity for serving patient requirements.  Project work required the installation of scaffolding up the side of the six-level structure.

DSC_0144 EDITED

Geiger Brothers used a synchronized gantry crane system to set the #3 high pressure steam boiler at Cabell Huntington Hospital.

Geiger Brothers used a synchronized gantry crane system to set the #3 high pressure steam boiler at Cabell Huntington Hospital.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s